Delivery & lead times
Lead times are quoted per line, not averaged across the order. Nationwide delivery, installation in Lagos.
How lead time is quoted
Every line on a quotation carries its own lead time. An order of chairs, toner and a fit-out is three different supply chains, and averaging them produces a date that is wrong for all three. If one line is holding the rest up we will say so on the quotation, so you can split the delivery rather than wait on the slowest item.
Broadly: stationery and consumables we hold move fastest, IT and furniture depend on what is in stock against what is on order, and anything made to a measure - PVC doors, wardrobes, kitchens, panelling - is fabrication time plus installation and is quoted per project.
Where we deliver
Nationwide. Lagos deliveries are made by our own vehicles; outside Lagos we use carriers and the cost appears as a line on the quotation rather than being buried in the unit price. Remote sites and anything that needs a dedicated vehicle are priced per job.
Installation
Furniture assembly and fit-out installation are included on Lagos orders unless the quotation says otherwise, and quoted per site elsewhere. Tell us the floor, whether there is a service lift, and the access hours: a third-floor delivery into a building that only permits deliveries before 9 a.m. is a different job from a ground-floor one, and finding that out on the day costs a return trip.
Receiving the delivery
Check the goods against the delivery note before signing. Damage in transit is straightforward to resolve when it is recorded at handover and difficult to resolve a week later, so note anything visible on the note itself, even if you have not opened every carton.
Somebody with the authority to accept the delivery needs to be present. We will not leave an order with a security post unless you have told us in writing to do so.
Government and institutional orders
Ministries, schools and agencies frequently have delivery windows, gate procedures and documentation requirements that are not obvious from outside. Tell us about them at quotation stage and we will build them into the schedule - see bulk and tender supply.